Scope:
1748 KW Electrical Capacity, 200 RTON Chilled Water Capacity, 13000 lbs/hr Steam Capacity
Objective:
A system that would ensure hospital operations could continue in the aftermath of storms
Solutions:
Trigeneration system of two Guascor Energy containerized modules that achieve a total efficiency above 80% by combining heat recovery with electrical generation.
Results:
In just 11 months, the hospital had reliable energy and saved millions of dollars. Four more hospitals plan to replicate TEKSOL’s solution.